Shed FAQ

Shed FAQ
 

Sheds under 75SF

  • Needs to meet street side property line setbacks.
  • No permit fee required.
  • Completed shed registration form found online https://bournema.viewpointcloud.com/ follow links for e-permitting.
  • 1 copy of a site/plot plan, showing size & location of all buildings with setbacks and location of proposed shed clearly marked uploaded to the e-permit.
  • All work to be done in accordance with MA State Building Code 780 CMR

Sheds under 200SF

  • No permit fee required.
  • Needs to meet side, rear and street side property line setbacks.
  • Completed shed registration form found online https://bournema.viewpointcloud.com/ follow links for e-permitting.
  • 1 copy of a site/plot plan, showing size & location of all buildings with setbacks and location of proposed shed clearly marked uploaded to the e-permit.
  • All work to be done in accordance with MA State Building Code 780 CMR

Sheds over 200SF

  • Permit fee of $60.00
  • Sheds to meet side, rear, and street side property line setbacks.
  • Completed Building Express Permit form found online https://bournema.viewpointcloud.com/ follow links for e-permitting.
  • 1 copy of a site/plot plan, showing size & location of all buildings with setbacks and location of proposed shed clearly marked.
  • All work to be done in accordance with MA State Building Code 780 CMR

 Setback Information:

  • Use chart below to determine your individual setbacks based on what zone your property is located in.
  • Use zoning map found on Town of Bourne Website https://www.townofbourne.com/engineering
  • Setbacks for septic systems are for a slab foundation 10ft from SAS or tank.   

 

District

 

R-80

GD/SDD

R-40

B-1/V-B

B-2

B-3

B-4

Min. front yard/street side setback

40

40

30

0*

30*

30

30*

Min rear & side yard setback

25

25

15

12*

12*

12

30

* See section 2500 Intensity of Use Schedule in the Bourne Zoning Bylaw for footnotes