Shed FAQ
Shed FAQ
Sheds under 75SF
- Needs to meet street side property line setbacks.
- No permit fee required.
- Completed shed registration form found online https://bournema.viewpointcloud.com/ follow links for e-permitting.
- 1 copy of a site/plot plan, showing size & location of all buildings with setbacks and location of proposed shed clearly marked uploaded to the e-permit.
- All work to be done in accordance with MA State Building Code 780 CMR
Sheds under 200SF
- No permit fee required.
- Needs to meet side, rear and street side property line setbacks.
- Completed shed registration form found online https://bournema.viewpointcloud.com/ follow links for e-permitting.
- 1 copy of a site/plot plan, showing size & location of all buildings with setbacks and location of proposed shed clearly marked uploaded to the e-permit.
- All work to be done in accordance with MA State Building Code 780 CMR
Sheds over 200SF
- Permit fee of $60.00
- Sheds to meet side, rear, and street side property line setbacks.
- Completed Building Express Permit form found online https://bournema.viewpointcloud.com/ follow links for e-permitting.
- 1 copy of a site/plot plan, showing size & location of all buildings with setbacks and location of proposed shed clearly marked.
- All work to be done in accordance with MA State Building Code 780 CMR
Setback Information:
- Use chart below to determine your individual setbacks based on what zone your property is located in.
- Use zoning map found on Town of Bourne Website https://www.townofbourne.com/engineering
- Setbacks for septic systems are for a slab foundation 10ft from SAS or tank.
| District | ||||||
| R-80 | GD/SDD | R-40 | B-1/V-B | B-2 | B-3 | B-4 |
Min. front yard/street side setback | 40 | 40 | 30 | 0* | 30* | 30 | 30* |
Min rear & side yard setback | 25 | 25 | 15 | 12* | 12* | 12 | 30 |
* See section 2500 Intensity of Use Schedule in the Bourne Zoning Bylaw for footnotes